We have been fortunate to have a number of projects from different funding agencies. Please see a list of them below:
At North Carolina State University
5. Integrated Corridor Management: Cooperative Signal Control with Freeway Operations and Ramp Metering, PI, $280,113, USDOT Region 4 University Transportation Center (STRIDE), August 2020 – August 2021
4. Guide for the Formulation of Long-Range Plans for Replacement Needs and Budget of Highway Operations Equipment (NCHRP 13-06A), Co-PI, $324,998, National Cooperative Highway Research Program, May 2020 – February 2022
3. NCDOT University Transportation Center of Excellence on Mobility and Congestion, Co-PI, $1,000,000, North Carolina Department of Transportation, February 2020 – July 2022
2. A Center of Excellence on Connected Autonomous Vehicles (NC-CAV), Co-PI, $1,000,000, North Carolina Department of Transportation, February 2020 – July 2022.
1. Preparing for Traffic Signal Operations in a Multi-Modal Connected and Autonomous Vehicle Environment, PI, $67,439, Washington State Department of Transportation (WSDOT), August 2019 – December 2020.
At Washington State University
13. Dynamic Speed Harmonization in Connected Urban Street Networks: Improving Mobility, PI, $40,000. USDOT Center for Advanced Multimodal Mobility Solutions and Education. August 2018 – February 2020
12. A Hierarchical Priority-based Control of Signalized Intersections in Semi-Connected Corridors, PI, $180,000, USDOT Region 10 University Transportation Center (PacTrans), August 2018 – February 2020
11. Role and Potential of Signal Infrastructure in a Connected and Automated Environment, PI, $70,301, Oak Ridge National Laboratory, January 2018 – December 2018
10. Develop the PacTrans Workforce Development Institute (WDI), Co-PI (WSU PI), $350,000, PacTrans, August 2017 – July 2019
9. Characterization of Underserved Population Perceptions and Mobility Needs in Connected-Vehicle and Smarter City Environments, Co-PI (WSU PI), $350,000, PacTrans, August 2017 – July 2018
8. Dynamic Metering in Connected Urban Street Networks: Improving Mobility, PI, $40,000, PacTrans, August 2017 – July 2018
7. Preparing for Traffic Signal Operations in a Multi-Modal Connected and Autonomous Vehicle Environment, PI, $200,000, Washington State Department of Transportation (WSDOT), July 2017 – June 2019
6. A Data-Driven Safety Assessment of Various Left Turn Phasing Strategies, PI, PacTrans and WSDOT, $80,000, December 2016 – December 2017
5. Enhancing Safe Traffic Operations Using Connected Vehicles Data and Technologies, Co-PI (WSU PI), PacTrans, $180,000, June 2015 – December 2016
4. Regional Map Based Analytical Platform for State-Wide Highway Safety Performance Assessment, PI, PacTrans, $180,000, January 2015 – December 2016
3. Guide for Utilization Measurement and Management of Fleet Equipment (NCHRP 13-05), PI, National Cooperative Highway Research Program, $399,998, June 2015 – May 2017
2. Safety Data Management and Analysis: Addressing the Continuing Education Needs for the Pacific Northwest, Co-PI (WSU PI), PacTrans, $512,500, January 2015 – December 2017
1. Production of a Major Update to the 2010 Highway Capacity Manual (NCHRP 03-115), WSU PI, Kittleson and Associates Inc., $12,000, October 2014 – March 2016